Relocation of existing flavouring Machine line to aid increasing manufacturing capacity on site.

The existing flavouring area was to be upgraded and the equipment relocated, the new location required new cabling support infrastructure installing along new control and power cables.

New Basket tray was installed and welded in place on the flavouring machines, the cabling was to be installed from an existing Control panel. The point to point wiring testing of the control cabling was completed, insulation resistance completed for the electrical cables and the relevant handover paperwork issued to the client for sign-off.

Further site assistance was required during commissioning to aid the client in achieving the required deadline for the project.

The Project was completed on time and within budget.